Duration: 2024
Client: Thai Binh 1 Thermal Power Plant
Scope of work: inspection and maintenance of Steam Turbine Generator and auxiliary equipment of S1 Unit at Thai Binh 1 Thermal Power Plant
Duration: 2022 - 2023
Client: NSRP
Scope of work: FGD (Flue Gas Desulphurisation): internal cleaning, welding plate C276 for inside wall and bottom; Expansion joint: open, cleaning, replace 20 joint; Heat Exchanger: open, cleaning tube and bundle, pressure test tube and shell side; Vessel and Desuperheater: open, internal cleaning, inspection; replace valve in Steam Boiler line, overhauling for Manual valve, PSV and control valve, total 176 pcs; HHPS: NDE inspection weld joint, repair defect weld joint; Basin Sea Water Intake: remove mud, cleaning and inspection (diving
Duration: 2024
Client: NSRP
Scope of work: Procure Piping material, support material, steam tracing material, insulation material, painting material, civil material; Fabrication and Bending of Heating Coil, AR receiving pipe line; Installation of support and Heating Coil inside Tank; Installation of support and AR receiving pipe line, steam tracing for pipeline, insulation for pipeline; Construction of support foundation; Pre-commissioning and Support for Commissioning of system
Duration: 2022
Client: NSRP
Scope of work: Replace tanker end hose & inspection test for floating hose (outer line)
Duration: 2021
Client: Ninh Binh Introgenous fertilizer LTD
Scope of work: Overhaul and maintenance of STG capacity 12MW, and Compressor capacity 8MW
Duration: 2020 - 2020
Client: Amon Nitrat Thai Binh Factory
Scope of work: Maintenance of mechanical items, hand valves, safety valves
Duration: 2022, 2023
Client: NSRP
Scope of work: Cleaning/Blasting/ Painting, Installation mechanical seal, repairing defects for Crude Oil Tanks 151-TK-002, 151-TK-008, 151-TK-005
Duration: 2021
Client: Ninh Binh Introgenous fertilizer LTD
Scope of work: Overhaul and maintenance of STG capacity 12MW, and Compressor capacity 8MW
Duration: 2019
Client: PEC LTD
Scope of work: Providing valve transportation and valve repair services for DCSM packages 4 - Sections 3,4,5,6 (Total: 120 Valves)
Duration: 2019
Client: NSRP
Scope of work: Turbines maintenance at Nghi Son Refinery and Petrochemical
Duration: 2024 - now
Client: NSRP
Scope of work: Supply manpower (Rotating, Electrical, Instrument, Analytical, Mechanical, Craftman), Maintenace of rotating and static mechanical equipment at NSRP
Duration: 8/2018 – 11/2018
Client: Nghi Son Refinery and Petrochemical
Scope of work: Overhaul and maintenance of steam turbine generator I
Duration: 4/2017 – 12/2019
Client: NSRP
Scope of work: Manpower and equipment supply to support the operation of Nghi Son Refinery and Petrochemical for the 3 years contract period
Duration: 6/2017 – 7/2017
Client: JGCS Consortium
Scope of work: Tanks Maintenance, PSV Valve Maintenance, Manual Valve Maintenance, MOC (Man – age of Change)