Quang Trach I Thermal Power Plant

Quang Trach I Thermal Power Plant

Duration: December 2024 – September 2025

Client: General Contractor CC1

Scope of Work: Construction and installation of the underground cooling water pipeline system for the thermal power plant, consisting of two pipelines with a diameter of 350 inches, each 1.5 km in length